Infiltration/Inflow and Sewer System
Evaluation Studies Carmel Sewer District No. 4
Carmel, NY

These studies involved the investigation and evaluation of 22,000+ feet of sanitary sewers tributary to the Carmel Sewer District #4 Wastewater Treatment Plant. Project scope included manhole inspection, flow monitoring, television inspection and smoke testing.

The Infiltration/Inflow and Sewer System Evaluation Studies phases of this project were presented in a single report to the client, along with appropriate recommendations for the remediation of excessive infiltration/inflow. Contract plans and specifications included provisions for chemical and physical root removal, chemical grouting, manhole repairs, and post-remedial television inspection to ensure completeness of the remedial action.

Upon completion of these cost-effective measures, infiltration/inflow was significantly reduced. Operations and maintenance of the collection system was improved and excessive flow to the plant was eliminated.


          
Home | News | Folchetti Overview | Projects | Resources | Employment | Directions | About Us

Current Seqra Documents | Brewster Stormwater Management | Contact Us

This website is protected under United States intellectual property copyright laws. Any reproduction of any portion of this site without the express written consent of
                                   J. Robert Folchetti and Associates is strictly prohibited and subject to severe civil and criminal liability as dictated by law.                                                   COPYRIGHT © 2005 All Rights Reserved