Home   |   About Us   |   News   |   Projects   |   Folchetti Overview   |   SEQRA   |   Career Center   |   Directions   |   Resources   | Contact Us
 
 

Bedford Central School District Fox Lane Campus
Wastewater Treatment Plant Upgrade
Westchester County, New York

Bedford Fox Lane School

JRFA was retained by the Bedford Central School District to provide facility planning and detailed design for the Fox Lane Campus Wastewater Treatment Plant. The project involved complete upgrade of the existing 0.020 mgd wastewater treatment plant. The facility was designed to meet strict permit limits and included primary, secondary (biological) and tertiary (sand filtration) treatment in addition to microfiltration, phosphorous removal, disinfection, solids handling and telemetering. Under the NYCDEP WWTP Upgrade Program, the treatment system was required to meet strict limits for giardia cyst removal, removal/inactivation of viruses, design and phosphorous removal. JRFA conducted a flow and sampling study to evaluate existing flows and loads and impact of microfiltration on existing treatment systems. Specifications included detailed description of the requirements for maintenance of plant operations during construction.

Reference:
Mr. Thomas Briggs, Director of Building & Grounds
Bedford Central School District
P.O. Box 180
Mount Kisco, NY 10549
(914) 241-6015

 


          
Home | News | Folchetti Overview | Projects | Resources | Employment | Directions | About Us

Current Seqra Documents | Brewster Stormwater Management | Contact Us

This website is protected under United States intellectual property copyright laws. Any reproduction of any portion of this site without the express written consent of
                                   J. Robert Folchetti and Associates is strictly prohibited and subject to severe civil and criminal liability as dictated by law.                                                   COPYRIGHT © 2005 All Rights Reserved